Projects
ESIA Study for Africa Oil Ethiopia Hamessa 1 Exploratory Drilling
ESIA Study for Africa Oil Ethiopia Hamessa 1 Exploratory Drilling TS Environment has conducted ESIA study for exploratory drilling project, along the western shore of Lake Abaya in the rift basin area block for Africa Oil Ethiopia. The Main...
ESIA Study for Calub-Hilala Gas Gathering and Treatment operations
ESIA Study for Calub-Hilala Gas Gathering and Treatment operations ESIA study has been conducted by TS Environment for Calub-Hilala Gas Gathering and Treatment operations and approved by Ministry of Mining. The project is located in Calub n...
Baseline Environmental Study for Corbetti Geothermal Project, Phase 1 Operations
TS Environment has provided competent personnel; adequate equipment and supplies for the delivery of the services to assist CGC meet its legal, environmental and social obligations for its operations in developing a geothermal project in...
ESG Action Plan Implementation for YES Food and Beverages Brands
TS Environment Technology has delivered the implementation of the ESG action plan for Yes Brand’s Food and Beverages PLC as they intended to implement an ESG action plan on phase I, II & III production sites as part their strategic...
Occupational Safety and Health (OSH) Training for SIEMENS Ethiopia
A three days training on Environment, Health & Safety (EHS) Management system and Risk Assessment systems was conducted by TS Environment Technology Business Group to 20 members of Siemens AG Ethio- Kenya 500 KV HVDC converter substation...
Environmental Impact Assessment for ASCOM Mining Ethiopia Dish Mountain Gold Project
In collabration with SRK consulting (UK) Ltd, TS Environment conducted an Environmental Impact Assessment in parallel with the feasibility study of developing a gold mining project (known as the Dish Mountain Project) of ASCOM Mining Ethiopia....
RAPID Biodiversity Study for Reykjavik Geothermal Tulu Moye Project
Baseline biodiversity study has been conducted by TS Environment for RG on the larger Project area (Tulu Moye geothermal area). The Rapid (follow-up) biodiversity study focused only on the Gnaro lava field and surrounding areas which attempted...
Study of 132kV Transmission Line at Preparatory Survey on the Project for ALTO LANGANO 35 MW Geothermal Power Generation in Ethiopia
TS Environment Technology has conducted a feasibility Study of 132kV Transmission Line at Preparatory Survey on the Project for ALTO LANGANO 35 MW Geothermal Power Generation in Ethiopia. The Main activities of the proposed study Included; 132Kv...
Environmental Resources Management (ERM), and Allana Potash
- ESIA study for Gold exploration project
- Resettlement Plan study for Gold exploration project
Partner for full ESIA
Partner for full resettlement plan
Afar, North East Ethiopia
Richland Resources ((TanzaniteOne)
- Mine closure planning
Full consulting
Tanzania
Tullow Oil Ethiopia
- Environmental Management support
Waste management, waste water system design, environmental monitoring
South Omo, Ethiopia
BGP Geoservices Priv. Ltd Co
- Environmental Management support
Waste management, waste water system design, environmental monitoring
South Omo, Ethiopia