TS Environment Technology has conducted a feasibility Study of 132kV Transmission Line at Preparatory Survey on the Project for ALTO LANGANO 35 MW Geothermal Power Generation in Ethiopia. The Main activities of the proposed study Included;

  • 132Kv Transmission Line Design
  • This Study is a design analysis for 132KV overhead electric power transmission line of length approximately 11.5Km between Altolangano and Adamitulu Substation. The necessary steps were followed in designing an overhead transmission tower line is in computing the line conductor tension and sag, analysis of loads on transmission tower, route surveying and route selection, and preparation of route profile.
  • 132Kv Adamitulu substation expansion
  • The survey team has assessed and reviewed relevant design and as built documents from Adami-Tulu substation to identify the following major primary and expansion design documents: Adami-Tulu primary drawings, specifications and BQ of Adami-Tulu 132kv line bay extension and schematic diagrams including SCADA system for Aluto Langano 35mw power plant.