ESIA Study for Calub-Hilala Gas Gathering and Treatment operations

ESIA study has been conducted by TS Environment for Calub-Hilala Gas Gathering and Treatment operations and approved by Ministry of Mining. The project is located in Calub n Ethiopian Somali region.  The ESIA study focuses on different components of the project including: Mobilization

  • Site Preparation;
  • Camp Set Up and Logistics;
  • The Hilala Gas Treatment plant
  • The Hilala-Calub gas transmission pipeline
  • The Calub Gas Processing plant

ESIA Study of for Calub-Hilala Gas Drilling 2D Seismic Survey

ESIA study has been conducted by TS Environment for 2D seismic Project at Block 11 and 13 and Block 12 and 16    of Calub-Hilala location in Ethiopian Somali region.

The elements of seismic surveying which are discussed in the study comprises the following:

  • survey area
  • survey techniques;
  • survey preparation and access survey;
  • camp set up and logistics;
  • line survey and clearance;
  • seismic data acquisition;
  • ancillary operations; and
  • reinstatement.