Warning: Use of undefined constant ‘1’ - assumed '‘1’' (this will throw an Error in a future version of PHP) in /homepages/34/d738551877/htdocs/wp-content/plugins/simple-visitor-counter-widget/index.php on line 215

Warning: "continue" targeting switch is equivalent to "break". Did you mean to use "continue 2"? in /homepages/34/d738551877/htdocs/wp-content/themes/Divi/includes/builder/functions.php on line 5753
Environmental Impact Assessment for ASCOM Mining Ethiopia Dish Mountain Gold Project | TS Environment Technology

In collabration with SRK consulting (UK) Ltd, TS Environment conducted an Environmental Impact Assessment in parallel with the feasibility study of developing a gold mining project (known as the Dish Mountain Project) of ASCOM Mining Ethiopia. The Main activities of the proposed EIA Included;

  • Socio-Economic Survey
  • Stakeholders Engagement Survey
  • Archeological Study
  • Soil, Sediment and land Capability Survey